Churchwell house #58
Finished building closets
Caulked & painted closets & trim
Cleaned floor
Installed door knobs
Installed closet rods
Continued working on shed
Ready for flooring
Ready for septic
Tort house #59
Finished caulking sheathing & bottom plate
Taped tees
Sealed doors,windows, electrical & plumbing
Continued working on hvac
Insulated behind bath tub
Repaired framing @ circuit beaker panel
Finished shelving supports
Caulked a/c return
Continued working on porch
Installed bath tubs
Concreted bath drain area
Cleaned floor
Continued working on shed
Ready for insulation
Ready for septic
A wonderful warm lunch on a cool day of vegetable soup,corn bread & cookies. Thanks to the Church of Christ.