#114 4002 Sundown Trail
#115 4004 Sundown Trail
#116 4006 Sundown Trail

21 volunteers (plus 5 office workers and 2 lunch workers) continued building 4002 (Chuy & Deysi) and 4004 (Jose & Sierra). The framing load had been delivered to 4006 (Senly).  The insulators got 4002 ready for sheet rock which is scheduled soon.  We also finished the strong room and installed the attic stairs.  We caulked the home, while a crew painted the exterior trim work at the warehouse.  Interior support blocks were installed in anticipation of sheet rocking.  On 4004, we marked the turbine locations and placed the equipment in the attic.  We installed porch posts in both homes, and put up the porch ceiling on 4004.  

A great Sloppy Joe lunch was provided by the Salvation Army which got us through the afternoon. We prayed about a bunch of concerns including prayers for some of our missing regulars, and of course our Habitat Family. 

See you Saturday.


photos by Becky