Saturday, April 22, 2023

#114 4002 Sundown Trail
#115 4004 Sundown Trail
#116 4006 Sundown Trail

25 volunteers (including selected families and a few home owners) worked on all three homes. 4002 (Chuy & Deysi), 4004 (Jose & Sierra), and 4006 (Senlly). 

On 4002, we finished most of the interior trim in preparation for painting. 

On 4004, we continued HVAC work and brackets. 

4006 got a lot of attention. We sheathed the walls, built and installed the porch header, finished the top plate, and string lined the walls and braced them for installation of joists. 

It was great to have some of our old friends back on the site, and be led by the ever faithful Ronald, Roger, and Paul

Lunch was provided by Lakeside Baptist Church members of the GAP Sunday School Class

Erick was back, and healthy. Please continue praying for those mentioned and those other concerns that have not been mentioned. See you Wednesday.

Photos by Molly & Senlly.